TABLE OF CONTENTS HA-8/E Instructions and Guidance to Tenderers, A13 Thames Gateway Part 1 General 1.Introduction 2.The Tender Invitation Documents 3.The A13 Thames Gateway DBFO Contract 4.Glossary Part 2 Instructions to Tenderers 1.General 2.Information Issued to Tenderers 3.Arrangements for Liaison, Site Inspections and Surveys 4.Amendments to Tender Invitation Documents 5.Tender Enquiries and Communications 6.Submission of Tenders 7.Evaluation of Tenders 8.Summary of the Submissions Required During the Tender Preparation Period 9.Checklist for Tenders Part 3 Guidance to Tenderers Introduction Sub-Part A Contingent Scheme 1.General 2.An Overview of the Statutory Process 3.The Department's and DBFO Co.'s Roles in the Statutory Process Sub-Part B Explanation of Technical Requirements 1.Proposals for Construction Requirements 2.Review During the Tender Presentation Period of Tenderers' 3.Design and Certification Procedure; Review Procedure 4.Operation and Maintenance 5.Quality Management 6.Communications and Traffic Signal Requirements 7.Archaeology, Landscaping and Ecology 8.Handback - Departures from Standards Form Sub-Part C Explanation of Commercial Requirements 1.Risk Transfer 2.Payment Mechanisms 3.Partnering 4.Generation of Ideals 5.The Introduction of Users Paid Tolls for Long Vehicles 6.Change Procedure 7.Guarantees 8.Multilateral Funding Agencies 9.Taxation 10.Insurance -Insurance Form Annex 1 Availability Payment Illustration Annex 2 Worked Safety Example Sub-Part D Explanation of Tenders Required 1.Introduction 2.General Requirements 3.Standard Bid 4.Variant Bids 5.Profile of the DBFO Co. 6.Details of Principal Contractual Arrangements 7.Financial Structure of the DBFO Co. 8.Forecasts 9.Financial Model - Anti-Collusion Certificate Appendix Bid forms Sub-Part E Tender Evaluation 1.Introduction 2.Technical Evaluation 3.Financial and Commercial Evaluation Part 4 Project Specific Information 1.Project Description 2.The Tenderers 3.Financial Information 4.The Department's Design Advisers 5.The Schemes 6.Standard Bid 7.Contact Person 8.Submission of Tenders 9.Data 10.Advance Works 11.Land Acquisition Arrangements 12.Current Arrangements for Maintenance 13.Changes Made to Draft Orders Subsequent to the Issue of Prequalification Documents 14.Existing Design 15.Consents or Agreements Reached or Under Discussion Relating to the Existing Design 16.Significant Hazards 17.Road Improvements, Maintenance Works, Minor Works Programmed 18.Works Referred to in the Roads Programme 19.Trials 20.Planning Applications and Highways Act (1980) Section 278 Agreement 21.Events Affecting Traffic Flows 22.Noise Mitigation 23.Traffic Sensitive Streets 24.Traffic Control, Communications and Traffic Signal Systems 25.Design Parameters to be Submitted by the Tenderer 26.Railtrack 27.British Waterways 28.Other Scheme Specific Issues 28.1 Other Works 28.2 Structures 28.3 The Greater London Authority (GLA) 28.4 Integrated Transport 28.5 Docklands Road 28.6London Borough of Barking and Dagenham LBBA Artscape Proposals 28.7 A13 West of Heathway to MarDyke ("A13 Bypass") 28.8 Traffic Orders for the Existing Road 28.9 Primary Route Network (PRN) Signing Requirements 28.10Statutory Undertakers 28.11Landscape and Ecology 28.12Archaeology 28.13The Traffic Director for London (TDfL) 28.14Regional Traffic Control Centres 28.15Drainage 28.16Motoring Organisations 28.17Channel Tunnel Rail Link 28.18Heavy Load and High Load Routes 28.19Public Transport 28.20Rathbone Transport 28.21Highways Act (1980) Section 4 Agreements 28.22River Thames Crossings 28.23Trafficmaster 28.24Traffic Census Equipment 28.25Value Engineering 28.26Tunnel Standards